A gateway to Ethiopia’s business intelligenceMy Membership ↗samson@multilinkconsult.comPowered by MultiLink Consulting

Feasibility study / business plan

Animal Feed Production Feasibility Study — Ethiopia, 2026 Edition የእንስሳት መኖ ማምረቻ የአዋጭነት ጥናት — 2026

Sold by E251PRO

No reviews yet

A complete animal feed production feasibility study for Ethiopia, rebuilt on 2026 prices. Covers the market and demand projection to 2036, plant capacity, raw materials, machinery, manpower and a full financial model at an 18 per cent discount rate, with sensitivity analysis. Supplied as a publication-ready PDF

ETB 3,000

Pay with telebirr, Chapa or a CBE transfer. Your download unlocks after the payment is verified.

Share
Format
PDF
File size
1.3 MB
Version
1.0
Last updated
November 23, 2026
Licence
Single-user licence
Updates
Version purchased

Description

Overview
This study assesses a animal feed plant in Addis Ababa with an installed capacity of 15,000 tonnes per annum. It is a working investment document: every cost line is built from a stated quantity and unit price, every financial table is reproducible from the assumptions, and the financial model is supplied as an Excel workbook so that you can change the price, the capacity or the financing and see the result immediately.
The study is built on 2026 data. The exchange rate, the National Bank policy rate, the electricity tariff, the regulated fuel price, the corporate tax rate and the current investment incentive regulation are all taken from their current published sources and dated. Where no current published series exists for a specific input price, the technical norm is retained and the price restated to the 2026 level by a stated index, and the study says so rather than presenting an estimate as a measurement.
Main chapters
• Introduction and basis of the study, including the full macroeconomic and costing assumptions
• Product description and application
• Market study and plant capacity, with demand projected to 2036
• Materials and inputs: raw materials, auxiliary materials and utilities
• Technology and engineering: process, environmental considerations, machinery, land and buildings
• Human resource and training requirement
• Financial analysis: investment, production cost, profitability, break-even, payback, IRR and NPV
• Risk and sensitivity analysis
• Conclusions and recommendations
• Annex A: financial analysis supporting tables
Key analytical components
• Demand projection for 2026 to 2036 with the derivation stated
• Bill of machinery with foreign and local cost split at the current exchange rate
• Working capital built from stated day assumptions
• Loan schedule, depreciation schedule and tax computation shown in full
• Ten-year income statement, cash flow and discounted cash flow
• Seven-case sensitivity analysis with a tornado chart
• A separate schedule of outstanding validation requirements naming the source for each figure to confirm
Practical applications
Use it to prepare a bank or Development Bank of Ethiopia loan application, to support an investment licence application, to brief a board or an investment committee, to size a plant and its machinery order, as a teaching case in project appraisal, or as a structured template for a study of your own in a related sub-sector.

Licence and usage

Single-user licence

Usage restrictions

For use by the buyer only; no resale or redistribution.

Refund policy

Refund within 7 days of purchase if the file has not been downloaded

The licence terms in force when you buy are saved with your purchase. Later changes to this listing do not change them.

About the seller

E251PRO

Seller support

Questions about this product are handled through Ethiopia251 support, which coordinates with the seller.

View storefront

Customer reviews

Reviews are moderated and only verified buyers can leave one.

Reviews

There are no reviews yet.

Only logged in customers who have purchased this product may leave a review.